WelshWave Logo

Is Your Supply Chain Too Reliant on a Single Asset? Insights from a Water Firm CEO

Is Your Supply Chain Too Reliant on a Single Asset? Insights from a Water Firm CEO

Published: 2025-12-20 21:00:09 | Category: technology

South East Water has faced significant scrutiny following a six-day water supply failure that left around 24,000 properties in Tunbridge Wells without adequate tap water from 29 November to 4 December. This incident has prompted the company's chief executive, David Hinton, to acknowledge the firm's excessive reliance on individual facilities and propose plans to improve resilience in the water supply system.

Last updated: 04 December 2023 (BST)

What’s happening now

Following the supply failure, residents of Tunbridge Wells experienced significant disruption as they were without adequate tap water for six days. The situation worsened as, for the subsequent nine days, they were instructed to boil the water before consumption, even after supplies were restored. The cause of the supply issue was traced to a disinfection problem at Pembury Water Treatment Works. However, South East Water has stated that there was no evidence of infection in the water supply. The incident has led to heightened scrutiny of the company, including calls for Hinton's resignation.

Key takeaways

  • 24,000 properties in Tunbridge Wells were affected by a six-day water supply disruption.
  • Residents faced a nine-day boiling water advisory after the supply was restored.
  • David Hinton acknowledged over-reliance on individual facilities and proposed improvements.
  • South East Water plans to invest £30 million in expanding capacity at Bewl Water reservoir.
  • The Drinking Water Inspectorate is currently investigating the incident.

Timeline: how we got here

The water supply failure in Tunbridge Wells unfolded as follows:

  • 29 November 2023: A significant supply failure occurred due to disinfection issues at Pembury Water Treatment Works.
  • 4 December 2023: Water supplies were partially restored to affected properties.
  • 4 December 2023: A boiling water advisory was issued for residents, lasting for nine days.
  • Ongoing (December 2023): The Drinking Water Inspectorate has begun an investigation into the incident.

What’s new vs what’s known

New today/this week

David Hinton's remarks regarding the company's reliance on individual facilities have emerged as a significant development. His proposals to enhance infrastructure and expand capacity at Bewl Water reservoir aim to prevent similar incidents in the future. Additionally, the ongoing investigation by the Drinking Water Inspectorate highlights the gravity of the situation.

What was already established

Prior to the incident, South East Water faced criticism for its infrastructure and supply management. The company had already been in discussions about increasing customer bills to fund improvements, with average annual bills set to rise from £232 to £274 by 2030. This suggests a longstanding concern regarding the adequacy of water supply infrastructure in the region.

Impact for the UK

Consumers and households

The disruption in Tunbridge Wells significantly impacted local households, causing inconvenience and health concerns related to the boiling water advisory. Residents dependent on a reliable water supply faced challenges in daily activities, and the incident raised questions about the safety and reliability of water services in the area.

Businesses and jobs

Local businesses experienced disruptions due to the water supply failure, potentially impacting productivity and customer service. Prolonged supply issues can damage the reputation of water providers and lead to decreased customer confidence, which could affect business operations in the region.

Policy and regulation

The incident has drawn the attention of regulatory bodies, with the Drinking Water Inspectorate conducting an investigation. This could lead to increased oversight of South East Water and its practices. Additionally, the proposed price increases to fund infrastructure improvements may face scrutiny from consumers and regulators alike.

Numbers that matter

  • 24,000: Properties affected by the water supply failure in Tunbridge Wells.
  • 6 days: Duration of the water supply disruption.
  • 9 days: Length of the boiling water advisory after supply restoration.
  • £30 million: Planned investment for expanding capacity at Bewl Water reservoir.
  • 36%: Average proposed price increase for customers in England over the next five years.

Definitions and jargon buster

  • Boiling water advisory: A public health recommendation to boil water before consumption to eliminate potential contaminants.
  • Disinfection problem: Issues related to the treatment of water that ensure it is safe for drinking.
  • Drinking Water Inspectorate: The regulatory body responsible for ensuring the quality of drinking water in the UK.
  • Ofwat: The Water Services Regulation Authority, which oversees water companies in England and Wales.

How to think about the next steps

Near term (0–4 weeks)

In the immediate future, residents can expect continued updates from South East Water regarding the investigation results and any further steps to ensure safe water supply. Monitoring the effectiveness of the boiling water advisory will also be crucial.

Medium term (1–6 months)

In the coming months, the proposed expansion at Bewl Water reservoir may begin to take shape, pending regulatory approvals. Customers should remain informed about potential changes to their water bills as the company seeks to improve infrastructure.

Signals to watch

  • Outcomes from the Drinking Water Inspectorate's investigation.
  • Updates on the Bewl Water expansion project.
  • Any announcements regarding changes in water pricing or additional restrictions.

Practical guidance

Do

  • Stay informed about local water quality updates from South East Water.
  • Follow health guidelines related to boiling water advisories.
  • Be aware of potential changes to your water bill and infrastructure improvements.

Don’t

  • Ignore local advisories regarding water quality and safety.
  • Assume that issues have been fully resolved without official confirmation.
  • Neglect to report any ongoing supply problems to South East Water.

Checklist

  • Check local news for updates on the water supply situation.
  • Ensure you are following boiling water guidelines if still in effect.
  • Monitor your water bill for any changes or increases.
  • Engage with community resources for assistance if needed.
  • Stay connected with local environmental or consumer advocacy groups.

Risks, caveats, and uncertainties

As the situation evolves, uncertainties remain regarding the long-term implications of the water supply failure. The outcomes of the Drinking Water Inspectorate's investigation will be critical in determining the company's accountability and the potential for regulatory changes. Furthermore, the proposed increase in bills to fund necessary improvements may face resistance from consumers concerned about affordability.

Bottom line

The recent water supply failure in Tunbridge Wells has exposed significant vulnerabilities in South East Water's infrastructure. As the company seeks to enhance its resilience through proposed investments, customers should remain vigilant about updates and potential impacts on their water bills. The situation underscores the importance of robust water supply systems in ensuring community health and safety.

FAQs

What caused the water supply failure in Tunbridge Wells?

The water supply failure was attributed to a disinfection problem at Pembury Water Treatment Works, although South East Water confirmed there was no evidence of contamination.

What should residents do during a boiling water advisory?

During a boiling water advisory, residents should boil tap water before using it for drinking, cooking, or brushing teeth to eliminate potential contaminants.

How is South East Water planning to improve its infrastructure?

South East Water plans to invest £30 million in expanding output capacity at Bewl Water reservoir to enhance resilience and improve water supply reliability for the region.


Latest News